PROJECT: VICTORIA BRIDGE

Layher Allround modular scaffolding was used from a design provided by Layher’s engineers, which worked perfectly for this project. Due to limited space on the construction site and being next to a major highway the scaffold had to be cantilevered to reduce the footprint on the ground. Heb Construction said due to a constricted site, space was at a premium, we required a system that could deliver a minimal footprint be highly adaptable and above all provide a high level of safety for our site staff. The Layher system exceeded both our requirements and expectations and Master Scaffolding highly efficient and effective service was provided at all times.

Project Manager
LAYHER Scaffolding