Ross Murphy
Senior Project Engineer
HEB Construction
Due to a constricted site, space was at a premium. We required a system that could deliver a minimal footprint, be highly adaptable and above all, provide a high level of safety for our site staff. The Layher system exceeded both our requirements and expectations and in conjunction with the contractor, STM Roofing and Scaffolding, a highly efficient and effective service was provided at all times. The ease in which the system could be adapted and the contractors’ willingness resulted in very little downtime in between construction phases. The whole experience was only positive and they will be my first consideration on future projects.